Related Work Experience

Donna High School #2, Donna, Texas
Donna ISD
Project Cost $46,500,000

 

 

Electrical Engineer of record for new 300,000 sf High School.Electrical Distribution of dual 4000 Amp, 480/277V 3 phase service with phase failure protection and Surge Protection. Design also included Fire alarm system, intercom, clock, PA, access control. Lighting consisted of direct/indirect fixtures with occupancy sensors in classrooms. Building Automation System (BAS) was integrated with HVAC systems and lighting controls for whole building. Building was equipped with two kitchens and large Auditorium. Design included Football & Track field, baseball field, and softball field. Mechanical design consisted of a water cooled chilled water central plant equipped with 3- 600ton chillers, associated cooling towers, and pumps. Pumping layout was designed with primary/secondary pumping system and 2-pipe chilled water distribution throughout the facility. Air conditioning was accomplished with variable air volume central stations in dual path and by-pass return configurations. Single duct terminals with electric heat were provided throughout for individual room temperature control. Science areas were supplemented with energy recovery units to minimize energy consumption due to mandated ventilation requirements. Entire HVAC system utilized an energy management system with capabilities of demand control ventilation (CO2), and humidity control.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Electrical Engineer of record for a renovation of existing 48,600 sf historical building.Lighting was designed with direct/indirect lighting fixtures, LED, architectural, and typical fluorescent lighting. Electrical distribution of 2,000 Amp 277/480V, three-phase main switchboard. Design of 1250KW generator and transfer switch to serve whole facility. Electrical design included Fire Alarm, intercom, security, and access control. Mechanical design consisted of an air cooled chilled water central plant equipped with 2- 100ton chillers tied in parallel. Pumping layout was designed with primary/secondary pumping system and 2-pipe chilled water distribution throughout the facility. Air conditioning was accomplished with variable air volume central stations in dual path configurations. Single duct terminals with electric heat were provided throughout for individual room temperature control. Entire HVAC system utilized an energy management system with capabilities of demand control ventilation (CO2), and humidity control.system with capabilities of demand control ventilation (CO2), and humidity control.
 
 
 
 
 
 
                                                                                                                             
 
                                                                                                                               PSJA ISD T-STEM
                                                                                                                               Early College High School
                                                                                                                           
                                                                                                                               Phase II
 
                                                                                                                               Pharr, Texas
                                                                                                                               PSJA ISD
                                                                                                                           
                                                                                                                               Project Cost $9,691,000
 
Renovation of 9,690 sf Gymnasium, 10,686 sf Stambaugh, 14,676 sf Texbook, and additionof a new 10,918 sf Cafeteria. Specialty suspended pendant lighting at cafeteria and typical fluorescent lighting interior. Lighting controls included occupancy sensors and relay panels which tied into existing lighting control system. Provided 80KW generator for service to one serving counter, cooler/freezer at kitchen and included power for all IDF rooms. Design utilized Integrated Facility System Switchboards for electrical service to each building. Electrical design also included Fire Alarm, intercom, security, and access control tied into existing facility. Mechanical design consisted of 2 air cooled chilled water central plants equipped with 180ton chillers each. Pumping layout was designed with primary a pumping system and 2-pipe chilled water distribution throughout the facility. Air conditioning was accomplished with variable air volume central stations and energy recovery units. Single duct terminals with electric heat were provided throughout for individual room temperature control. Entire HVAC system utilized an energy management system with capabilities of demand control ventilation (CO2), and humidity control.
 
 
 
 
 
 
 
 
 
PSJA ISD Science Lab Classroom Additions
(PSJA Memorial, PSJA HS, Tapp Center at Ford Elementary, and Options School)
Pharr, Texas
PSJA ISD
 
Project Cost $7,478,000
 
Addition of 16,737 sf (7 classroom – PSJA Memorial), 19,329 sf (8 Classroom – PSJA HS),5,537 sf (2 Classroom – PSJA Tapp Center), and 5,537 sf (2 Classroom – PSJA Options) science labs. Lighting controls integrated with Building Automation System (BAS) for lighting override including HVAC for classrooms. Isimet System specified for all labs with emergency shut off for gas, water, and electrical for individual labs. Mechanical design consisted of variable air volume packaged DX rooftop units with energy recovery ventilators. Single duct terminals with electric heat were provided throughout for individual room temperature control. Entire HVAC system utilized an energy management system with capabilities of demand control ventilation (CO2), and humidity control.
 
 
 
 
 
 
 
 
HVAC and Renovations to Leal Elementary School, Mission, Texas
Mission ISD
Project Cost $1,837,800
 
 
Electrical Engineer of record for renovation of 49,154 sf Elementary School. Electricaldesign consisted of new electrical service to each building and new lighting was furnished to meet energy code standards. Design included upgrading fire alarm system and installation of new Voice over IP intercom system for whole campus. Mechanical design consisted of variable air volume packaged DX rooftop units serving each classroom wing. Single duct terminals with electric heat were provided throughout for individual room temperature control. Entire HVAC system utilized an energy management system with capabilities of demand control ventilation (CO2), and humidity control.
 
 
 
 
 
 
 
 
Alton Elementary Additions and Renovations, Mission, Texas
 
Mission ISD
 
Project Cost $4,036,500
 
Electrical Engineer of record for addition of 33,182 sf Classroom and Office additions.Design included upgrading fire alarm system and installation of new Voice over IP intercom system for whole campus. Mechanical design consisted of an air cooled chilled water central plants equipped with primary pumping system and 2-pipe chilled water distribution throughout the facility. Air conditioning was accomplished with variable air volume central stations. Single duct terminals with electric heat were provided throughout for individual room temperature control. Entire HVAC system utilized an energy management system with capabilities of demand control ventilation (CO2), and humidity control.
 
 
 
 
PSJA ISD North High School Weight Room Building, Pharr, Texas
PSJA ISD
Project Cost $974,900
Electrical Engineer of record for 7,600 sf weight room addition to existing campus. Lightingincluded occupancy sensors for controls. Extended fire alarm, security, intercom, phone, data from existing building. Mechanical design consisted of constant volume packaged rooftop units with ventilation and humidity control.
 
 
IDEA Academy – McAllen, San Benito, & Mission
IDEA Academy
Project Cost $4,478,400 (McAllen)
Project Cost $3,954,840 (Mission)
Project Cost $3,954,840 (San Benito)
Electrical Engineer of record for 31,100 sf Classroom and administration building forMcAllen Campus, Classroom additions for 27,464 sf to existing campus, and 27,464 sf Classroom additions to existing campus. Lighting included occupancy sensors for controls. Extended fire alarm, security, intercom, phone, data from existing building. Mechanical design consisted of multi-staged DX condensing units with variable air volume central station and single duct terminals utilizing electric heat for individual room temperature control. Entire HVAC system utilized an energy management system with capabilities of demand control ventilation (CO2), and humidity control.
 
PSJA ISD T-STEM
Early College High School
(Old Memorial Middle School)
 
Phase I
Renovations and Additions
 
Pharr, Texas
PSJA ISD
 
Project Cost $8,087,000